The mold design process:
DFM in 2 working days with 3D part file received
3D mold drawing: 5 – 7 working days after DFM feedback
Mold Modification feedback: within 24 hours after new part file received
documents with mold shipment:
Detail BOM
Mold Components drawing
2D print mold drawing
3D mold drawing
Electrode drawing
Hot runner drawing
Mold design experience:
Mold design standard, meet European, USA market
Design Supervisor experience, above 10 years.
Average designer experience: above 5 years